Power Management Design and Build was flown out to Cyprus by the BBC for an urgent intervention they needed on the power system that supplied the British East Mediterranean Relay Station (BEMRS) at Zygi, east of Limassol. The engagement came from a recommendation made by Andy West Associates.

The transmitter station is one of the largest of its kind in the world and broadcasts programmes created by BBC World Service in London.

Daily at 1400 GMT all transmitters are required simultaneously which means the working environment had to be very carefully managed without delays in reinstating any transmitter.

The project included replacing the vacuum bottle in the GEC 11kV circuit breakers, some of which had completed over 30,000 switching cycles.

We were responsible to oversee and sign the project off on behalf of the BBC, having satisfied ourselves that the team, including Areva T&D and site personnel, had completed the works. The intervention was delivered successfully and ahead of deadline.

 

Video is included for illustrative purposes only. Power Management Design and Build cannot be held responsible for content held on external websites.

High Voltage for Pinewood Studios

A case study about our expertise at work in the Media and Entertainment sector


Power Management Design and Build was asked by Andy West Associates on behalf of Pinewood Studios to provide an 11KV network and switchgear specification and design. 

Having invested several million pounds in a new 10MVA connection Pinewood needed a design for an 11kV distribution system for the entire Pinewood Studios site.

We specified a new 11kV switchboard and designed a new 11kV ring main. Previously, Pinewood needed to use their own on-site generator for peak lopping which proved noisy, expensive and operationally impractical. The newly specified switchgear utilised vacuum switches to replace SF6 switches which were not environmentally friendly. 

Our experts worked alongside the AWA electrical engineers to complete a critical project for this world renowned studios where TV and feature films are made, for example James Bond and Star Wars movies amongst others. 

 

Video is included for illustrative purposes only. Power Management Design and Build cannot be held responsible for content held on external websites.

Harmonic mitigation for stage lighting for Royal Opera House

A case study about our expertise at work in the Media and Entertainment sector

logo-roh.jpg

A senior consultant at Power Management Design and Build was called in by the Royal Opera House to work alongside their prime contractors Ove Arup and Schneider Electric.

The project was well advanced and the opening night was quickly approaching but sign-off by the distribution network operator (DNO) could not go ahead without an intervention that they deemed necessary. 

By identifying the pre-load characteristics and by supplying and installing the proper remedial equipment, Power Management Design and Build consultants were able to assemble a team to work across weekends with just two shutdowns.

As a result the stage lighting was approved for operation by EDF. 